Place unopened packages of laminate flooring in the room or rooms in which they are to be installed.
Laying locking laminate flooring.
Lay out the unopened boxes of laminate planks in the room.
If you are installing the flooring below grade or in a room like a basement with high humidity or moisture lay down a vapor barrier before you install the flooring.
This will minimize shrinkage or expansion when they react to room temperature and humidity step 2 check for moisture levels.
Rotate downward on the plank until the joint locks image 3.
To cut the flooring lay the board on its face bottom up and cut with a saw equipped with a fine tooth blade for flooring.
Join boards by inserting tongue into groove and pushing down until boards lock together.
This should be done at least 48 hours before the laminate boards are placed so they have time to adjust to the temperature and humidity.
In this video i am showing how to install laminate flooring for the first time.
Moisture can often destroy a perfect laminate floor installation so before you begin it is very.
Step 1 let the boards acclimate.
If you place laminate flooring on a weak or uneven sub floor the new floor will be compromised and eventually buckle damage the laminate locking system creak or create micro gaps in the new floor.
How to install laminate flooring.
They should acclimate for at least 48 hours.
Repeat previous steps to complete installation.
Nail baseboards and molding to wall not to laminate.
Save the trimmed sections because you can use these pieces to start other rows.
Directly onto the subfloor lay down a layer of plastic sheeting to create a moisture barrier.
Here are some ways you can check for problems in a sub floor.
This will allow them to acclimate to the room s temperature and humidity.
Keep this angle as you push the plank in until the laminate edges meet.
Raise the outside edge of the plank upward approximately 1.